Skip to content

Industrial

Husky Corporation

Pacific, Missouri
Husky Corporation
Skibbe Uhlig

Work Performed: New construction of a 17,000 SF metal building addition. Work included complete site renovation, construction of a storage facility and expansion of the parking lot. The property being located in a known flood plain added some complexities, but the existing manufacturing facility ran at 100% during the six-month project.

Adams Building

Seattle, Washington
Michelson Organization
Lance Mueller & Associates

Work Performed: A. J. Brown was General Contractor on this 235,000 SF single loaded concrete tilt up distribution center and self performed all structural concrete, flatwork and tilt up for this building

The Rainier Building at Sumner Corporate Park

Seattle, Washington
Michelson Organization
Lance Mueller & Associates

Work Performed: The building consists of a 403,000 SF distribution center. Tilt-up construction was utilized for the perimeter of the building, which included 112 dock high doors and four drive-in doors. The project took just under five months to build.

Snoqualmie Building

Tacoma, Washington
Michelson Organization
Lance Mueller & Associates

Work Performed: A 500,000 SF concrete tilt up distribution center on which A. J. Brown was General Contractor and self performed all structural concrete, flatwork and tilt up.

Graybar Distribution Center

Winston-Salem, North Carolina
Graybar
Bauer & Associates

Work Performed: A 30,000 SF Design/Build regional distribution center utilized concrete tilt wall systems with structural steel roof. A. J. Brown purchased the ground as part of a 1031 exchange and helped Graybar save $1 MM in taxes.

Testimonials

“A.J. Brown is a first class organization and stepped up to the plate when it counted most. We look forward to our next project together.”

- Ed Cuccio, The One Resource