Skip to content

Retail

Six Row Brewing Company

St. Louis, Missouri
Ridgeline Group
Klitzing Welsch Associates, Inc.

Work Performed: Design/Build construction project consisted of converting the old Falstaff Brewery into a craft brewery. A. J. Brown reconfigured the historic building to facilitate a new copper seven-barrel brewing system. The system included fermentation tanks & cooling system, steam boiler system, walk-in coolers and brite tanks. In addition to the brew operations area, a retail bar was designed for on-site sale of kegs, growlers and beer by the glass.

Belleau Creek Plaza

St. Peters, Missouri
Belleau Creek, LLC
Archimages

Work Performed: A. J. Brown constructed a new 19,000 SF retail center on a small, constricted site with busy roads on two sides. Building on such a tight footprint required special care and advanced planning, as did dealing with the high plastic clay soil. In spite of these obstacles, A. J. Brown completed the load-bearing masonry and steel frame building on time and under budget.

Hillmann Farm Plaza

O’Fallon, Missouri
Hillman Farm, LLC
Archimages

Work Performed: A. J. Brown has earned a reputation for quality, cost-effective retail space construction. Hillman Farm Plaza further bolsters that reputation. The attractive 26,000 SF retail mall features load-bearing masonry and steel-frame construction.

20/20 Café

Des Peres, Missouri
Des Peres Medical, LLC
Wind Architects

Work Performed: The physicians at The Des Peres Medical Office building requested a Café for their new building. The 1,200 SF project consisted of a coffee bar and sandwich shop located at the main entrance of the already operational building. Space was a premium and construction took place off a busy entrance. A. J. Brown successfully delivered within the four-month construction schedule.

Oliver’s Crossing Retail

Winston-Salem, North Carolina
Brownstone Properties

Work Performed: A Design/Build retail center developed as an out parcel of an existing, larger shopping center.

Testimonials

“I compliment the professionalism and expertise of A.J. Brown’s staff. Their cooperation, attention to detail and conscientious nature made the project run efficiently in many, many regards including timing and precision.”

- Brent Schadler, Goddard Systems, Inc.